FastSaying

Numbers nine and ten are both currently underway. It takes between 12 and 18 months per site, including final inspections and landscaping, and each house costs about $65,000 to complete — with much of our material being donated or coming to us at a discount due to the generosity of many local businesses.

Barbara Manning

CurrentlyFinalIncludingMonthsNineNumbersPerSiteTakesTenUnderway

Related Quotes

I have ten commandments. The first nine are, thou shalt not bore. The tenth is, thou shalt have right of final cut.
— Billy Wilder
BoreCommandmentsCut
Give nine, save ten
— Turkish Proverb
NineSaveTen
The site is currently classified as an industrial site, so if you clean it up it has to be to that standard, or the next standard which would be commercial and following that is residential. Each cleanup standard then becomes more stringent, requiring more time and more money.
— Chuck Hadden
ClassifiedCleanCurrently
The site roared twenty-four hours a day for nine full months and beyond. From autumn through winter and into spring the crews labored in twelve-hour shifts, got some sleep, and came back for more. The enormous scale of their workplace is difficult to convey.
— William Langewiesche
AutumnBeyondFour
Lyons was intended to hold about 32,500 vehicles per day, but we're currently seeing 34,000 vehicles or more between Glades and Yamato. That's a four to five percentage increase.
— Dan Weisberg
CurrentlyHoldIntended