FastSaying

Wind is intermittent and the developer will first need to go through six to 12 months of wind monitoring (to determine best placement).

Jeff Deren

Will

Related Quotes

That project will burn a waste product imported from the Mainland until the developer acquires a local fuel source.
— Jeff Deren
Will
We will be purchasing the energy, not the capacity.
— Jeff Deren
EnergyWill
We cannot include a wind turbine to be firm capacity.
— Jeff Deren
CapacityFirmInclude
Right now we get 93 percent of our energy from burning fossil fuels. If all of these projects come on-line that number will be down to around 55 percent.
— Jeff Deren
EnergyProjectsRight
We actually had purchase power agreements signed by a wind developer and a municipal solid waste developer, but the developers had trouble finding a site and it was right about the time we were switching over to a co-op and the funding fell through.
— Jeff Deren
Power